Vestas wins Spanish wind order from ENHOL

0


Renewable energy company ENHOL has placed a 51 MW order for the Cascante wind farm, to be located in Navarra, Spain. The contract includes the supply and installation of eight V162-6.2 MW wind turbines delivered in 6.4 MW power mode, as well as a 20-year Active Output Maintenance (AOM) 5000 service agreement.

“We would like to thank our long-term customer ENHOL for their trust in Vestas’ latest technology. We are also glad to see how our EnVentus platform is gaining traction in Spain. We are convinced our latest and more powerful platform will make a strong contribution to Spain’s energy transition over the coming years,” said Vestas Head of Sales Mediterranean, Africa & Middle East, Agustín Sánchez Tembleque.

Turbine delivery is expected to start in 4Q24, while commissioning is planned for the 1H25.

Upon commissioning, the wind farm will prevent 23 000 tpy of CO2 from being emitted into the atmosphere. This is equivalent to removing 15 500 European passenger cars from the road every year.

 

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global’s Spring 2024 issue

The Spring 2024 issue of Energy Global starts with a guest comment from Field on how battery storage sites can serve as a viable solution to curtailed energy, before moving on to a regional report from Théodore Reed-Martin, Editorial Assistant, Energy Global, looking at the state of renewables in Europe. This issue also hosts an array of technical articles on electrical infrastructure, turbine and blade monitoring, battery storage technology, coatings, and more.

Read the article online at: https://www.energyglobal.com/wind/20032024/vestas-wins-spanish-wind-order-from-enhol/



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *